QINGDAO CI'AN INDUSTRIAL CO., LTD

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Home ProductsSteel Structure Workshop

Prefabricated Steel Structure Workshop Galvanized Surface Z Section Long Life Span

I'm Online Chat Now
Thank you so much for the excellent solution of the steel structure warehouse. Good job!

—— Mohammad Sharif

CAFC-005 is wonderful. My client love it very much. Thank you.

—— Masego Aaron

Good quality, good price, good service. Thank you very much to excellent container houses.

—— Bill Micol

Wonderful after-sale services. Very professional in steel structure buildings construction and materials.

—— Chuah telk lim

Prefabricated Steel Structure Workshop Galvanized Surface Z Section Long Life Span

Prefabricated Steel Structure Workshop Galvanized Surface Z Section Long Life Span
Prefabricated Steel Structure Workshop Galvanized Surface Z Section Long Life Span Prefabricated Steel Structure Workshop Galvanized Surface Z Section Long Life Span Prefabricated Steel Structure Workshop Galvanized Surface Z Section Long Life Span

Large Image :  Prefabricated Steel Structure Workshop Galvanized Surface Z Section Long Life Span Get Best Price

Product Details:

Place of Origin: China
Brand Name: Homeshore
Certification: ISO9001
Model Number: CAGJG-004

Payment & Shipping Terms:

Minimum Order Quantity: 100 square meters
Price: Negotiation
Packaging Details: Standard export packing
Delivery Time: 20-30 working days
Payment Terms: T/T, Western Union,, L/C
Supply Ability: 1500 ton per Month
Detailed Product Description
Wall And Roof: Color Steel Sandwich Panel Surface Treatment: Painted Or Galvanized
Type: Heavy Purlin: C/Z Galvanized Steel (Q235)
Color: Optional As Client Requrest Door: Electric Shutter Door
High Light:

steel portal frame house

,

steel shop buildings

Galvanized Z Section Steel Prefabricated Steel Structure Workshop With Long Life Span

 

Information of the structure and its materials:

 

The steel structure is divided into two parts, the main one consisting of beams and columns (usually I section, depending on the project) which make up the structural portals; and the secondary consisting of galvanized purlings (C or Z sections) and steel tensioners which give rigidity to the structure and at the same time serve as an anchor for the walls and the roof. Generally the main structure has two layers of anti-rust paint, but if necessary they can be galvanized.

 

Product Description:

 

Product Information
Column and beam Welding steel and hot-roll steel
Steel surface treatment painted(mid-grey)
Steel grade Q235B
Purlin and girt C section steel
Conection Method All bolt connection,easy installation
Wall&Roof Metal sheet with blue,red,whitegrey color
Door Rolling shutter door
Window Aluminum alloy window
Bolt and nuts High Strength Bolt and ordinary bolt
Design life span 50 years
Place of origin Qingdao city,Shandong province, China (Mainland)
Business type Manufacture and trading
Packaging Details Bunding with pallet or customize

 

Prefabricated Steel Structure Workshop Galvanized Surface Z Section Long Life Span 0
  

Drawing:


Prefabricated Steel Structure Workshop Galvanized Surface Z Section Long Life Span 1

 

The walls and roof may be composed of a galvanized sheet steel system with glass wool or sandwich panels. In a standard way they are quoted with a thickness of 50mm. Available thicknesses: 50 mm, 75 mm, 100 mm, 150 mm, 200 mm. Densities between 80 -120 kg m3.

Screws, nuts, brackets, anchor bolts and other inputs are quoted in the budget.

 

Prefabricated Steel Structure Workshop Galvanized Surface Z Section Long Life Span 2
 

Quality control:

General fabrication main process of steel structure is divided into: material preparation →cutting→ assembling→ welding→ drilling → assembly → correction → shot blasting and rust removal → painting → number →component acceptance ex-factory. In the steel structure production, according to the steel structure production process flow, grasp the key processes for quality control, such as control of key parts processing, main components of the process, measures, processing equipment, process equipment, etc. Each processing part, we can have strict inspection specifications. Welding engineering is the most important link in steel structure fabrication and installation engineering.

For the welding, We have our qualified CWI welding inspector to control the quality according to AWS-D1.1/D1.5 welding quality system. Spot welding strictly weld according to ASW welding quality system.

 
 Manufacturing, packing & shipping and payment terms:

 

Once the advance payment is made, the manufacturing of the structure begins. Depending on the size of the project, production takes between two and four weeks. The packed structure is loaded in containers 40 'HQ open top to facilitate loading and unloading. Ways of payment: T / T (30% advance, 70% before boarding) or L / C.


Application:


Prefabricated Steel Structure Workshop Galvanized Surface Z Section Long Life Span 3
 
 
 

Contact Details
Qingdao Ci'an Industrial Co., Ltd

Contact Person: Doris

Tel: +8618669822795

Send your inquiry directly to us